Genetic algorithm for the project scheduling problem with fuzzy time parameters
Author
Huang, Yilun ; Shou, Yongyi ; Zhang, Linda
Author_Institution
Dept. of Instrum. Sci. & Eng., Zhejiang Univ., Hangzhou, China
fYear
2011
fDate
6-9 Dec. 2011
Firstpage
689
Lastpage
693
Abstract
It is essential to allocate scarce resource and schedule the activities effectively so as to improve the project performance. Due to inherent uncertainties of the environment and activities, a mathematical model with fuzzy time parameters is adopted for the resource-constrained project scheduling problem. A genetic algorithm based on a fuzzy parallel schedule generation scheme is proposed. Two schemes of fuzzification are adopted for activity durations. Computational tests show that triangular fuzzy time parameters would be preferred.
Keywords
fuzzy set theory; genetic algorithms; mathematical analysis; project management; resource allocation; scheduling; activity scheduling; fuzzy parallel schedule generation scheme; genetic algorithm; mathematical model; project performance; resource-constrained project scheduling problem; scarce resource allocation; triangular fuzzy time parameters; Biological cells; Genetic algorithms; Job shop scheduling; Processor scheduling; Schedules; Uncertainty; Project; fuzzy; genetic algorithm; scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2011 IEEE International Conference on
Conference_Location
Singapore
ISSN
2157-3611
Print_ISBN
978-1-4577-0740-7
Electronic_ISBN
2157-3611
Type
conf
DOI
10.1109/IEEM.2011.6118005
Filename
6118005
Link To Document