DocumentCode
2854775
Title
Modeling and Simulating of Time Buffer Control for Engine Remanufacturing System
Author
Ma Li-li ; Chen Jun
Author_Institution
Coll. of Mech. Eng., Jiamusi Univ., Jiamusi, China
fYear
2009
fDate
19-20 Dec. 2009
Firstpage
1
Lastpage
4
Abstract
Time buffer is a common control strategy that drum-buffer-rope (DBR) method applies to achieve production planning and process control in manufacturing system. The effect of time buffer control is hard to be verified as to reduce uncertainty in remanufacturing system and improve production performance. In this paper the end-of-life engine remanufacturing flow simulation model was developed. And then time buffer control simulation model was founded and experimented dynamically with four uncertainty factors in remanufacturing system including processing time and routing uncertainty, machine failures rate and repair rate. Outcomes from experimental simulations show that time buffer control enables resource utilization of bottleneck increase, average work in process (WIP) decrease and system productivity improve.
Keywords
engines; production control; production planning; recycling; average work in process; drum-buffer-rope method; engine remanufacturing system; machine failures rate; process control; production planning; repair rate; the end-of-life engine remanufacturing flow simulation model; time buffer control; Control systems; Distributed Bragg reflectors; Engines; Manufacturing systems; Process control; Production planning; Production systems; Resource management; Routing; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Engineering and Computer Science, 2009. ICIECS 2009. International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-4994-1
Type
conf
DOI
10.1109/ICIECS.2009.5365624
Filename
5365624
Link To Document