DocumentCode :
2859094
Title :
Status of the production electropolishing system at JLAB
Author :
Mammosser, J. ; Delayen, J. ; Gordon, Josh ; Phillips, Linsey ; Wang, Tao ; Wu, A.T.
Author_Institution :
Jefferson Lab, Newport News, VA, USA
Volume :
5
fYear :
2003
fDate :
12-16 May 2003
Firstpage :
2860
Abstract :
Jefferson Lab has installed, and is in the process of commissioning, a production electropolish system, sized for 805 MHz SNS cavities. This paper describes the basic system design, plans for studying the effectiveness of polishing SNS high-β cavities and early results from cavity tests.
Keywords :
accelerator RF systems; electrolytic polishing; neutron sources; particle beam diagnostics; particle beam dynamics; superconducting magnets; 805 MHz; JLAB; Jefferson Lab; SNS cavities; production electropolishing system; Business continuity; Current density; Niobium; Process control; Production systems; Prototypes; Rails; Rough surfaces; Surface roughness; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN :
1063-3928
Print_ISBN :
0-7803-7738-9
Type :
conf
DOI :
10.1109/PAC.2003.1289746
Filename :
1289746
Link To Document :
بازگشت