Title :
In search of an improved BoM and MRP algorithm
Author :
Stapic, Zlatko ; Orehovacki, Tihomir ; Lovrencic, Alen
Author_Institution :
Fac. of Organ. & Inf., Univ. of Zagreb, Varazdin, Croatia
Abstract :
In facing the problem of building a complex yet fast and resource efficient enterprise resource planning (ERP) or extended resource planning (XRP) system the first obstacle is the creation of a bill of materials (BoM) algorithm, which is used to calculate material needs according to the production plan. Taking into consideration different possibilities of BoM implementation, we compared linked lists, tree structure and matrix implementation in relation to algorithm complexity. As we came to the conclusion that none of them suits the needs of modern systems, we proposed a new BoM algorithm called multiple linked list implementation. It combines the advantages of other implementations with a new approach based on two complex data structures used to represent both the data and relationships between products, parts or components used in production.
Keywords :
bills of materials; computational complexity; enterprise resource planning; BoM algorithm; MRP algorithm; XRP system; algorithm complexity; bill of materials; complex data structure; enterprise resource planning; extended resource planning; material needs; material requirements planning; multiple linked list implementation; production plan; Bills of materials; Companies; Data structures; Enterprise resource planning; Informatics; Materials requirements planning; Process planning; Production planning; Production systems; Tree data structures; Bill of Materials; BoM algorithm; Material Requirements Planning; algorithm complexity; data structures;
Conference_Titel :
Information Technology Interfaces, 2009. ITI '09. Proceedings of the ITI 2009 31st International Conference on
Conference_Location :
Dubrovnik
Print_ISBN :
978-953-7138-15-8
DOI :
10.1109/ITI.2009.5196167