Title :
Experience of the Deutsche Bundespost IN trial
Author_Institution :
Siemens AG, Munich
Abstract :
For the first IN realization step the DBPT decided to use three competing individual complete IN-solutions from different vendors/vendor consortiums. Each solution has to provide a service management system (SMS), a service control point (SCP), and service switching points (SSPs). The author describes the Siemens IN system which was delivered to the DBPT in November 1992 and is undergoing field trials
Keywords :
intelligent networks; DBPT; Deutsche Bundespost IN trial; Siemens IN system; field trials; service control point; service management system; service switching points;
Conference_Titel :
Intelligent Network - Fact or Fantasy? Tutorial Seminar, IEE
Conference_Location :
Coventry