DocumentCode
286675
Title
EMC development of a smoke meter
Author
Bharaj, J.S.
Author_Institution
Motor Ind. Res. Assoc., Nuneaton, UK
fYear
1993
fDate
34081
Firstpage
42461
Lastpage
42467
Abstract
EMI preventative measures should be designed-in at the start of the development of a project, to achieve compliance at production stage. In practice, EMC is often considered at the final stages of product development. Non-compliance at this late stage may require extensive design modifications, which will result in delays to production. The study illustrates the process and highlights some of the limiting factors associated with achieving compliance for a product in the final stages of the development cycle
Keywords
air pollution detection and control; electromagnetic compatibility; meters; smoke; test equipment; EMC development; EMI preventative measures; compliance; delays to production; product development; smoke meter;
fLanguage
English
Publisher
iet
Conference_Titel
Case Studies in EMC, IEE Colloquium on
Conference_Location
Nuneaton
Type
conf
Filename
257632
Link To Document