DocumentCode :
286675
Title :
EMC development of a smoke meter
Author :
Bharaj, J.S.
Author_Institution :
Motor Ind. Res. Assoc., Nuneaton, UK
fYear :
1993
fDate :
34081
Firstpage :
42461
Lastpage :
42467
Abstract :
EMI preventative measures should be designed-in at the start of the development of a project, to achieve compliance at production stage. In practice, EMC is often considered at the final stages of product development. Non-compliance at this late stage may require extensive design modifications, which will result in delays to production. The study illustrates the process and highlights some of the limiting factors associated with achieving compliance for a product in the final stages of the development cycle
Keywords :
air pollution detection and control; electromagnetic compatibility; meters; smoke; test equipment; EMC development; EMI preventative measures; compliance; delays to production; product development; smoke meter;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Case Studies in EMC, IEE Colloquium on
Conference_Location :
Nuneaton
Type :
conf
Filename :
257632
Link To Document :
بازگشت