• DocumentCode
    2866880
  • Title

    The implementation of a performance management system in an 8 inch fabrication facility within a unionized workforce

  • Author

    Acri, Amy ; Markowski, A. ; Rerick, Ray

  • Author_Institution
    Intersil Corp., Mountain Top, PA, USA
  • fYear
    2000
  • fDate
    2000
  • Firstpage
    219
  • Lastpage
    226
  • Abstract
    While many unionized environments avoid employing any system that exams their members´ individual performances Intersil Corporation, a leading manufacturer of hi-technology semiconductors, broke the norm in its self-managed workforce, subsequently, implementing a performance management system. The system was designed to create a simple tool that provided each hourly operator with accurate and timely feedback with respect to communication, initiative, job knowledge, quality, teamwork and work ethic. All of these characteristics are inherent qualities of an effective workforce, especially one where self-directed work teams govern the flow of production. The computerized performance review system was used to select training and employment development activities supportive of the company´s growth and profitability goals. The system was used to document individual performance patterns for continuous improvements
  • Keywords
    human resource management; personnel; semiconductor device manufacture; 8 inch; Intersil Corporation; performance management system; semiconductor manufacturer; unionized workforce; wafer fabrication facility; Employment; Environmental management; Ethics; Feedback; Job design; Lead compounds; Production; Profitability; Semiconductor device manufacture; Teamwork;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Semiconductor Manufacturing Conference and Workshop, 2000 IEEE/SEMI
  • Conference_Location
    Boston, MA
  • ISSN
    1078-8743
  • Print_ISBN
    0-7803-5921-6
  • Type

    conf

  • DOI
    10.1109/ASMC.2000.902591
  • Filename
    902591