DocumentCode :
286838
Title :
Design & installation of 22 kV power cable for London Underground Central Line refurbishment project
Author :
Field, C.J. ; Journeaux, T.L.
Author_Institution :
London Underground Ltd., UK
fYear :
1993
fDate :
23-25 Nov 1993
Firstpage :
184
Lastpage :
189
Abstract :
London Underground´s Central Line refurbishment project encompasses the complete refurbishment of the line including the provision of new trains, signalling systems and power supply systems. The power supplies refurbishment concerns renewal of all life expired equipment and the enhancement of equipment to meet increased demands for traction loads to a peak service loading of 36 trains per hour and the upgrading of power feeds to maintenance depots. When finished the total project will have cost approximately £700 m of which approximately £50 m will have been spent on the power system refurbishment. The work has been conducted in three stages of which the last was the Eastern section from Bethnal Green substation to Epping substation which is the subject of this paper
Keywords :
maintenance engineering; power cables; power systems; project engineering; railways; substations; 22 kV; London Underground; UK; installation; maintenance; power cable; power feeds; power supply systems; railways; refurbishment project; signalling; substation; traction loads; trains;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Power Cables and Accessories 10kV - 500kV, 1993., Third International Conference on
Conference_Location :
London
Print_ISBN :
0-85296-592-3
Type :
conf
Filename :
263355
Link To Document :
بازگشت