Title :
Project or Process? How to Measure the Real Type of Employees´ Activity?
Author :
Romanov, Dmitry ; Sidorov, Pavel
Author_Institution :
Higher Sch. of Econ., Moscow, Russia
Abstract :
By analyzing the logs of corporate e-mail networks we found a number of patterns, showing how the size of ego-networks of individual employees changes on a day by day basis. We proposed a simple model that adequately describes the observed time dependence of an employee\´s "social circle". Comparison of experimental data with the theoretical model showed that employees are divided into two groups - with fast and slow changes in their social circles, respectively. We believe that the presence of these groups reflects both project-type and process-type of employees\´ activities. Comparison of data obtained before and during the global economic crisis has shown that the crisis led to an actual reduction in project-type activities.
Keywords :
electronic mail; e-mail networks; economic crisis; ego networks; individual employees; social circle; Approximation methods; Companies; Electronic mail; Mathematical model; Social network services; business process; ego network; project management; social circle;
Conference_Titel :
Dependable, Autonomic and Secure Computing (DASC), 2011 IEEE Ninth International Conference on
Conference_Location :
Sydney, NSW
Print_ISBN :
978-1-4673-0006-3
DOI :
10.1109/DASC.2011.178