DocumentCode :
2869735
Title :
Pitfalls in least cost planning
Author :
Sener, Fred P.
fYear :
1989
fDate :
9-10 Oct 1989
Firstpage :
78
Lastpage :
87
Abstract :
An attempt is made to identify, for the casual or new user, the supply-side, demand-side, and economic pitfalls to be avoided when applying least-cost concepts to electric generation capacity planning. Suggestions for avoiding many pitfalls are provided. Also, the author identifies factors that one should find, or want to question if not found, in a least-cost planning study
Keywords :
economics; power system planning; demand-side; economics; electric generation capacity; least cost; power system planning; supply-side; Books; Capacity planning; Costs; Economic forecasting; Investments; Meeting planning; Power industry; Urban planning;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Symposium, 1989., Proceedings of the Twenty-First Annual North-American
Conference_Location :
Rolla, MO
Print_ISBN :
0-8186-2005-6
Type :
conf
DOI :
10.1109/NAPS.1989.77078
Filename :
77078
Link To Document :
بازگشت