DocumentCode :
2869867
Title :
Estimating the costs of a reengineering project
Author :
Sneed, Harry M.
Author_Institution :
Inst. fur Wirtschaftsinformatik, Regensburg Univ.
fYear :
2005
fDate :
11-11 Nov. 2005
Lastpage :
119
Abstract :
Accurate estimation of project costs is an essential prerequisite to making a reengineering project. Existing systems are usually reengineered because it is cheaper to reengineer them than to redevelop or to replace them. However, to make this decision, management must know what the reengineering will cost. This contribution describes an eight step tool supported process for calculating the time and the costs required to reengineer an existing system. The process is derived from the author´s 20 year experience in estimating reengineering projects and has been validated by several real life field experiments in which it has been refined and calibrated
Keywords :
costing; project management; software management; systems re-engineering; project cost estimation; software reengineering project; Costs; Encapsulation; Environmental economics; Investments; Life estimation; Packaging; Risk analysis; Software maintenance; Software measurement; Software quality; Reengineering; cost estimation; gap analysis; risk analysis; software measurement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Reverse Engineering, 12th Working Conference on
Conference_Location :
Pittsburgh, PA
ISSN :
1095-1350
Print_ISBN :
0-7695-2474-5
Type :
conf
DOI :
10.1109/WCRE.2005.18
Filename :
1566151
Link To Document :
بازگشت