DocumentCode
2869867
Title
Estimating the costs of a reengineering project
Author
Sneed, Harry M.
Author_Institution
Inst. fur Wirtschaftsinformatik, Regensburg Univ.
fYear
2005
fDate
11-11 Nov. 2005
Lastpage
119
Abstract
Accurate estimation of project costs is an essential prerequisite to making a reengineering project. Existing systems are usually reengineered because it is cheaper to reengineer them than to redevelop or to replace them. However, to make this decision, management must know what the reengineering will cost. This contribution describes an eight step tool supported process for calculating the time and the costs required to reengineer an existing system. The process is derived from the author´s 20 year experience in estimating reengineering projects and has been validated by several real life field experiments in which it has been refined and calibrated
Keywords
costing; project management; software management; systems re-engineering; project cost estimation; software reengineering project; Costs; Encapsulation; Environmental economics; Investments; Life estimation; Packaging; Risk analysis; Software maintenance; Software measurement; Software quality; Reengineering; cost estimation; gap analysis; risk analysis; software measurement;
fLanguage
English
Publisher
ieee
Conference_Titel
Reverse Engineering, 12th Working Conference on
Conference_Location
Pittsburgh, PA
ISSN
1095-1350
Print_ISBN
0-7695-2474-5
Type
conf
DOI
10.1109/WCRE.2005.18
Filename
1566151
Link To Document