• DocumentCode
    2869867
  • Title

    Estimating the costs of a reengineering project

  • Author

    Sneed, Harry M.

  • Author_Institution
    Inst. fur Wirtschaftsinformatik, Regensburg Univ.
  • fYear
    2005
  • fDate
    11-11 Nov. 2005
  • Lastpage
    119
  • Abstract
    Accurate estimation of project costs is an essential prerequisite to making a reengineering project. Existing systems are usually reengineered because it is cheaper to reengineer them than to redevelop or to replace them. However, to make this decision, management must know what the reengineering will cost. This contribution describes an eight step tool supported process for calculating the time and the costs required to reengineer an existing system. The process is derived from the author´s 20 year experience in estimating reengineering projects and has been validated by several real life field experiments in which it has been refined and calibrated
  • Keywords
    costing; project management; software management; systems re-engineering; project cost estimation; software reengineering project; Costs; Encapsulation; Environmental economics; Investments; Life estimation; Packaging; Risk analysis; Software maintenance; Software measurement; Software quality; Reengineering; cost estimation; gap analysis; risk analysis; software measurement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Reverse Engineering, 12th Working Conference on
  • Conference_Location
    Pittsburgh, PA
  • ISSN
    1095-1350
  • Print_ISBN
    0-7695-2474-5
  • Type

    conf

  • DOI
    10.1109/WCRE.2005.18
  • Filename
    1566151