• DocumentCode
    2869930
  • Title

    Automatic process for substation scheme generation based on ASCII load flow files

  • Author

    Kolysh, Anatoly L. ; Slonim, Michael A.

  • Author_Institution
    Israel Electr. Corp. Ltd., Haifa, Israel
  • Volume
    2
  • fYear
    1998
  • fDate
    18-20 May 1998
  • Firstpage
    921
  • Abstract
    The article describes an algorithm of an automatic drawing procedure for one-line substation diagrams. The algorithm is designed to recognize the substation scheme type, build the scheme tree graph and optimize tree branch location when the number of branch intersections are minimal. This procedure permits viewing the scheme in Medusa format and interactive editing without altering the scheme topology. Examples for applying algorithm development are shown
  • Keywords
    load flow; power system CAD; power system transients; substations; ASCII load flow files; CAD; Medusa format; automatic drawing procedure algorithm; branch intersections; interactive editing; one-line substation diagrams; power system design; scheme tree graph construction; substation scheme generation automation; tree branch location optimisation; Circuit breakers; Circuit topology; Computer graphics; Coupling circuits; Equations; Humans; Load flow; Power system transients; Substations; Tree graphs;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrotechnical Conference, 1998. MELECON 98., 9th Mediterranean
  • Conference_Location
    Tel-Aviv
  • Print_ISBN
    0-7803-3879-0
  • Type

    conf

  • DOI
    10.1109/MELCON.1998.699362
  • Filename
    699362