DocumentCode :
2869930
Title :
Automatic process for substation scheme generation based on ASCII load flow files
Author :
Kolysh, Anatoly L. ; Slonim, Michael A.
Author_Institution :
Israel Electr. Corp. Ltd., Haifa, Israel
Volume :
2
fYear :
1998
fDate :
18-20 May 1998
Firstpage :
921
Abstract :
The article describes an algorithm of an automatic drawing procedure for one-line substation diagrams. The algorithm is designed to recognize the substation scheme type, build the scheme tree graph and optimize tree branch location when the number of branch intersections are minimal. This procedure permits viewing the scheme in Medusa format and interactive editing without altering the scheme topology. Examples for applying algorithm development are shown
Keywords :
load flow; power system CAD; power system transients; substations; ASCII load flow files; CAD; Medusa format; automatic drawing procedure algorithm; branch intersections; interactive editing; one-line substation diagrams; power system design; scheme tree graph construction; substation scheme generation automation; tree branch location optimisation; Circuit breakers; Circuit topology; Computer graphics; Coupling circuits; Equations; Humans; Load flow; Power system transients; Substations; Tree graphs;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrotechnical Conference, 1998. MELECON 98., 9th Mediterranean
Conference_Location :
Tel-Aviv
Print_ISBN :
0-7803-3879-0
Type :
conf
DOI :
10.1109/MELCON.1998.699362
Filename :
699362
Link To Document :
بازگشت