• DocumentCode
    287001
  • Title

    Present status and prospects for hydro-power generation in England and Wales

  • Author

    Shaw, T.L.

  • Author_Institution
    Shawater Limited, UK
  • fYear
    1993
  • fDate
    17-19 Nov 1993
  • Firstpage
    100
  • Lastpage
    106
  • Abstract
    1% of present average electrical demand in England and Wales means a generating capacity of about 500 MW. This is about five times more than existing hydroelectric capacity in England and Wales, construction of most of which pre-dates nationalisation of the industry in 1948. The purpose of this paper is to consider the energy resource not currently tapped, having regard for the factors which will determine how much of this could be developed in the foreseeable future
  • Keywords
    hydroelectric power; hydroelectric power stations; 500 MW; England; UK; Wales; electrical demand; energy resource; generating capacity; hydroelectric power;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Renewable Energy - Clean Power 2001, 1993., International Conference on
  • Conference_Location
    London
  • Print_ISBN
    0-85296-605-9
  • Type

    conf

  • Filename
    264114