DocumentCode :
2873221
Title :
Business Process Re-engineering Risk Assessment Based on a New Improved FAHP
Author :
He, Yonggui ; Jiang, Lianfu ; Li, Bo
Author_Institution :
Bus. & Manage. Dept., North China Electr. Power Univ., Baoding, China
Volume :
2
fYear :
2009
fDate :
18-19 July 2009
Firstpage :
278
Lastpage :
281
Abstract :
The high failure ratio of BPR makes it necessary to evaluate the risks in the process of BPR actualization. In this paper, Based on study findings and the actual survey of enterprises for BPR risk assessment we set up the model of BPR risk assessment. The model is helpful to the manager in decision-making. In addition, the research data and Empirical Analysis of results will help enterprises to improve the flow and optimize the limited resources, so as to improve the performance of BPR.
Keywords :
business process re-engineering; data analysis; decision making; risk management; analytic hierarchy process; business process re-engineering; decision-making; empirical analysis; research data Analysis; risk assessment; Business process re-engineering; Costs; Decision making; Energy management; Helium; Information processing; Performance analysis; Quality management; Risk management; Strategic planning; Fuzzy theory; analytic hierarchy process; business process reengineering; performance evaluation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Processing, 2009. APCIP 2009. Asia-Pacific Conference on
Conference_Location :
Shenzhen
Print_ISBN :
978-0-7695-3699-6
Type :
conf
DOI :
10.1109/APCIP.2009.205
Filename :
5197190
Link To Document :
بازگشت