DocumentCode :
2873386
Title :
Project Management and Software Development Processes: Integrating RUP and PMBOK
Author :
Callegari, Daniel Antonio ; Bastos, Ricardo Melo
Author_Institution :
Pontificia Univ. Catolica do Rio Grande do Sul, Rio Grande do Sul
fYear :
2007
fDate :
20-23 March 2007
Firstpage :
1
Lastpage :
8
Abstract :
Developing a software product is a unique effort that involves dealing with activities and resources to build the desired results. The elements involved in such an effort can be seen from two perspectives: the software development process and the project management views. In order to develop a product with quality, we must provide an adequate combination of these two dimensions. However, this integration is generally not well addressed by the currently available software development processes. In this context, the PMBOK can provide the management perspective (project scope and lifecycle) while RUP, for instance, can bring the technical perspective (product scope and lifecycle). In this paper we present a model for software project management based on PMBOK and its integration with RUP. By formalizing an integrated model we can address the possibility of automating a number of tasks for software development.
Keywords :
Capability Maturity Model; formal verification; project management; software development management; PMBOK; RUP; lifecycle; project scope; software development processes; software product development; software project management; Automation; Best practices; Capability maturity model; IEC standards; ISO standards; Programming; Project management; Proposals; Software engineering; Software quality;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Systems Engineering and Modeling, 2007. ICSEM '07. International Conference on
Conference_Location :
Haifa, Israel
Print_ISBN :
1-4244-0771-0
Electronic_ISBN :
1-4244-0771-0
Type :
conf
DOI :
10.1109/ICSEM.2007.373327
Filename :
4243712
Link To Document :
بازگشت