DocumentCode :
2875389
Title :
Scrum and CMMI Level 5: The Magic Potion for Code Warriors
Author :
Sutherland, Jeff ; Jakobsen, Carsten Ruseng ; Johnson, Kent
Author_Institution :
Patientkeeper Inc., Newton
fYear :
2008
fDate :
7-10 Jan. 2008
Firstpage :
466
Lastpage :
466
Abstract :
Projects combining agile methods with CMMI are more successful in producing higher quality software that more effectively meets customer needs at a faster pace. Systematic software engineering works at CMMI level 5 and uses lean software development as a driver for optimizing software processes. Early pilot projects showed productivity on Scrum teams almost twice that of traditional teams. Other projects using a story-based test-driven approach to software development reduced defects in final test by 40%. We assert that Scrum and CMMI together bring a more powerful combination of adaptability and predictability than either one alone and suggest how other companies can combine them.
Keywords :
Capability Maturity Model; software quality; CMMI level 5; Capability Maturity Model; Scrum project; agile project methods; lean software development; software process optimization; software quality; systematic software engineering; Capability maturity model; Collaborative software; Coordinate measuring machines; Power system modeling; Productivity; Programming; Software engineering; Software quality; Software testing; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Hawaii International Conference on System Sciences, Proceedings of the 41st Annual
Conference_Location :
Waikoloa, HI
ISSN :
1530-1605
Type :
conf
DOI :
10.1109/HICSS.2008.384
Filename :
4439172
Link To Document :
بازگشت