• DocumentCode
    2875900
  • Title

    Project valuation and scheduling with recourse

  • Author

    Phillips, Fred Y. ; Srivastava, Rajendra K. ; Springer, Roy E.

  • Author_Institution
    Texas Univ., Austin, TX, USA
  • fYear
    1991
  • fDate
    27-31 Oct 1991
  • Firstpage
    266
  • Lastpage
    271
  • Abstract
    A model is presented to treat new product development projects that are subject to a mid-project management review. The model solves a `chicken and egg´ problem in concurrent life cycle analysis, namely that a project cannot be costed until it is scheduled, cannot be scheduled until the continuation decision is made, and cannot be evaluated for continuation until it is costed. The model solves the conundrum via a mixed integer programming formulation that makes all three determinations simultaneously. It poses the problem as an exercise in managerial options. A worked example illustrates the technique
  • Keywords
    integer programming; project engineering; research and development management; scheduling; R&D management; concurrent life cycle analysis; continuation decision; costing; mixed integer programming; model; optimisation; product development projects; research; scheduling; valuation; Concurrent engineering; Cost accounting; Delay; Integrated circuit modeling; Job shop scheduling; Linear programming; Optimal scheduling; Product development; Project management; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Technology Management : the New International Language
  • Conference_Location
    Portland, OR
  • Print_ISBN
    0-7803-0161-7
  • Type

    conf

  • DOI
    10.1109/PICMET.1991.183630
  • Filename
    183630