DocumentCode :
2878467
Title :
Strategic planning considerations for cost effective implementation of underground electrical power delivery
Author :
Parkinson, Edward L.
Author_Institution :
Dept. of Ind. Eng. & Manage. Syst., Central Florida Univ., Orlando, FL, USA
fYear :
1991
fDate :
27-31 Oct 1991
Firstpage :
732
Lastpage :
736
Abstract :
The author discusses key features of strategic planning that are being considered within the State of Florida for converting from above-ground to underground electrical power delivery systems. Technology, investment cost, operations and support cost, and other costs are identified and discussed from the perspective of systems analysis, with emphasis on real-world implementation capability. The author focuses on strategic planning issues that must be addressed to ensure that implementation is done in a cost-effective manner to protect the interests of the taxpayer. This is a complex and innovative undertaking for the state and is being proposed as a prototype for the country
Keywords :
management; underground distribution systems; Florida; investment cost; strategic planning; support cost; underground electrical power delivery; Cities and towns; Costs; Electromagnetic fields; Energy management; Engineering management; Industrial engineering; Investments; Power system management; Safety; Strategic planning;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Technology Management : the New International Language
Conference_Location :
Portland, OR
Print_ISBN :
0-7803-0161-7
Type :
conf
DOI :
10.1109/PICMET.1991.183785
Filename :
183785
Link To Document :
بازگشت