• DocumentCode
    2882153
  • Title

    Transport and installation of the LHC cryo-magnets

  • Author

    Artoos, K. ; Bartolome-Jimenez, S. ; Capatina, O. ; Chevalley, J.M. ; Foraz, K. ; Guinchard, M. ; Hauviller, C. ; Kershaw, K. ; Prodon, S. ; Ruehl, I. ; Trinquart, G. ; Weisz, S. ; Ponsot, P.

  • Author_Institution
    CERN, Geneva
  • fYear
    2007
  • fDate
    25-29 June 2007
  • Firstpage
    305
  • Lastpage
    307
  • Abstract
    Eleven years have passed between the beginning of transport and handling studies in 1996 and the completion of the LHC cryo-magnets installation in 2007. More than 1700 heavy, long and fragile cryo-magnets had to be transported and installed in the 27 km long LHC tunnel with very restricted available space. The size and complexity of the project involved challenges in the field of equipment design and manufacturing, maintenance, training and follow-up of operators and logistics. The paper presents the milestones, problems to be overcome and lessons learned during this project.
  • Keywords
    accelerator magnets; ion accelerators; proton accelerators; storage rings; synchrotrons; LHC cryomagnets installation; cryomagnet transport; equipment design; handling technique; magnet logistics; welding machines; Cranes; Large Hadron Collider; Lifting equipment; Logistics; Magnets; Manufacturing; Satellite broadcasting; Space technology; Testing; Vehicles;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2007. PAC. IEEE
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    978-1-4244-0916-7
  • Type

    conf

  • DOI
    10.1109/PAC.2007.4440193
  • Filename
    4440193