• DocumentCode
    2882311
  • Title

    Geometry of the LHC short straight sections before installation in the tunnel: Resulting aperture, axis and BPM positioning

  • Author

    Missiaen, D. ; Bestmann, P. ; Buzio, M. ; Fartoukh, S. ; Giovannozzi, M. ; Jeanneret, B. ; Lombardi, A. ; Papaphilippou, Y. ; Perez, J.C. ; Pauletta, S. ; Prin, H. ; Wildner, E.

  • Author_Institution
    CERN, Geneva
  • fYear
    2007
  • fDate
    25-29 June 2007
  • Firstpage
    335
  • Lastpage
    337
  • Abstract
    The large hadron collider short straight sections (SSS) are currently being installed in their final position in the accelerator tunnel. For all the SSSs, both those in the regular arcs as well as those in the insertion regions, magnetic axis and geometric measurements are made at different steps of their assembly. These stages range from production in the industry to the cryostating at CERN, as well as during and after cold tests or during installation of the BPM/beam screen assembly. The results of the geometry at the various production stages by means of different procedures and analysis tools are reported and discussed in details in this paper.
  • Keywords
    accelerator magnets; cryostats; particle beam diagnostics; storage rings; synchrotrons; BPM; CERN; LHC SSS; accelerator tunnel; beam positioning monitor; cryostating; geometry; large hadron collider short straight sections; magnet geometry; magnetic axis; Apertures; Assembly; Boring; Flanges; Geometry; Lamination; Large Hadron Collider; Position measurement; Production; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2007. PAC. IEEE
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    978-1-4244-0916-7
  • Type

    conf

  • DOI
    10.1109/PAC.2007.4440203
  • Filename
    4440203