DocumentCode
2882311
Title
Geometry of the LHC short straight sections before installation in the tunnel: Resulting aperture, axis and BPM positioning
Author
Missiaen, D. ; Bestmann, P. ; Buzio, M. ; Fartoukh, S. ; Giovannozzi, M. ; Jeanneret, B. ; Lombardi, A. ; Papaphilippou, Y. ; Perez, J.C. ; Pauletta, S. ; Prin, H. ; Wildner, E.
Author_Institution
CERN, Geneva
fYear
2007
fDate
25-29 June 2007
Firstpage
335
Lastpage
337
Abstract
The large hadron collider short straight sections (SSS) are currently being installed in their final position in the accelerator tunnel. For all the SSSs, both those in the regular arcs as well as those in the insertion regions, magnetic axis and geometric measurements are made at different steps of their assembly. These stages range from production in the industry to the cryostating at CERN, as well as during and after cold tests or during installation of the BPM/beam screen assembly. The results of the geometry at the various production stages by means of different procedures and analysis tools are reported and discussed in details in this paper.
Keywords
accelerator magnets; cryostats; particle beam diagnostics; storage rings; synchrotrons; BPM; CERN; LHC SSS; accelerator tunnel; beam positioning monitor; cryostating; geometry; large hadron collider short straight sections; magnet geometry; magnetic axis; Apertures; Assembly; Boring; Flanges; Geometry; Lamination; Large Hadron Collider; Position measurement; Production; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location
Albuquerque, NM
Print_ISBN
978-1-4244-0916-7
Type
conf
DOI
10.1109/PAC.2007.4440203
Filename
4440203
Link To Document