DocumentCode :
2884603
Title :
The JLAB 12 GEV energy upgrade of CEBAF for QCD and hadronic physics
Author :
Cardman, L.S. ; Harwood, L. ; Jefferson, T.
Author_Institution :
Thomas Jefferson Nat. Accel. Facility, Newport News
fYear :
2007
fDate :
25-29 June 2007
Firstpage :
58
Lastpage :
62
Abstract :
CEBAF at Jefferson Lab is a 5-pass, recirculating cw electron linac operating at ~6 GeV and devoted to basic research in nuclear physics. The 12 GeV Upgrade is a major project, sponsored by the DOE Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. We anticipate that the project will receive Critical Decision 2 approval this year and begin construction in 2008. The research program motivating the Upgrade includes: the study of hybrid mesons, which involve excited states of the glue, to explore the nature of quark confinement; dramatic improvements in our understanding of the QCD structure of the hadrons through the extension of our knowledge of their parton distribution functions to high XBjorken, where they are dominated by underlying valence quark structure, and a program of nucleon "tomography" via measurements of the Generalized Parton Distributions (GPDs), a broad program of experiments in the physics of nuclei that aims to understand the QCD basis for the nucleon-nucleon force and how nucleons and mesons arise as an approximation to the underlying quark-gluon structure; and precision tests of the Standard Model through parity violating deep inelastic and Moller scattering. The Upgrade includes: doubling the accelerating voltages of the linacs by adding 10 new high-performance cryomodules; the requisite expansion of the 2K cryogenics plant and rf power systems to support these cryomodules; upgrading the beam transport system from 6 to 12 GeV through extensive re-use and/or modification of existing hardware; and the addition of one recirculation arc, a new experimental area, and the beamline to it; and the construction of major new experimental equipment for the GPD, high-xBjorken, and hybrid meson programs. The presentation will describe the science briefly and provide some details about the accelerator plans.
Keywords :
accelerator RF systems; beam handling equipment; cryogenics; electron accelerators; linear accelerators; quantum chromodynamics; quark confinement; CEBAF upgrade; QCD; QCD hadron structure; beam transport system; cryogenics plant; cryomodules; electron volt energy 12 GeV; generalized parton distributions; hadronic physics; hybrid mesons; quark confinement; recirculating cw electron linac; recirculation arc; rf power systems; standard model; Distribution functions; Electrons; Force measurement; Linear particle accelerator; Mesons; Nuclear measurements; Nuclear physics; Power system modeling; Tomography; US Department of Energy;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location :
Albuquerque, NM
Print_ISBN :
978-1-4244-0916-7
Type :
conf
DOI :
10.1109/PAC.2007.4440339
Filename :
4440339
Link To Document :
بازگشت