• DocumentCode
    2885000
  • Title

    Test management with Testopia — missing link?

  • Author

    Fomin, Stanislav

  • Author_Institution
    Customized Inform Systems, USA
  • fYear
    2009
  • fDate
    28-29 Oct. 2009
  • Firstpage
    253
  • Lastpage
    258
  • Abstract
    The subject of functional testing is not new. The unity of conceptions and methods has been reached. Thus it´s needed to manage requirements, test-cases, results of test runs for each program setup, it´s also needed to manage metrics, to see the testing of customer requirements, to analyze the frequency of found mistakes, to calculate problem sites, to manage the testing team and demonstrate the whole process to the customer. For these purposes the specialized system for test management is needed.
  • Keywords
    formal specification; formal verification; program testing; systems analysis; Testopia; functional testing; program testing; test management system; Automatic control; Automatic testing; Design automation; Instruments; Product development; Programming; Security; Software quality; Software testing; System testing; Bugzilla; Test management; Testopia;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Software Engineering Conference in Russia (CEE-SECR), 2009 5th Central and Eastern European
  • Conference_Location
    Moscow
  • Print_ISBN
    978-1-4244-5664-2
  • Electronic_ISBN
    978-1-4244-5665-9
  • Type

    conf

  • DOI
    10.1109/CEE-SECR.2009.5501152
  • Filename
    5501152