• DocumentCode
    2886765
  • Title

    Lattice measurement for Fermilab main injector

  • Author

    Yang, M.J.

  • Author_Institution
    Fermilab, Batavia
  • fYear
    2007
  • fDate
    25-29 June 2007
  • Firstpage
    3498
  • Lastpage
    3500
  • Abstract
    The installation of seven large aperture quadrupoles during shut-down of 2006 necessitates new lattice measurements to evaluate the state of the machine lattice at energies critical to operation. For Main Injector (MI) this means at 8-GeV kinetic energy for proton and pbar injections, at 150-GeV extraction to Tevatron for collider operation,and at 120-GeV extraction to Numi for nutrino experiment and slow spill to fixed target test beam facility. The results of measurement at these three energies and their comparison to their corresponding calculations will be presented.
  • Keywords
    accelerator magnets; particle beam diagnostics; particle beam injection; proton accelerators; synchrotrons; BPM; Main Injector; Tevatron; WQB magnets; aperture quadrupoles; collider operation; electron volt energy 120 GeV; electron volt energy 150 GeV; electron volt energy 8 GeV; fermilab main injector; kinetic energy; machine lattice; neutrino experiment; pbar injections; proton injections; target test beam facility; Apertures; Data mining; Energy measurement; Kinetic energy; Lattices; Magnets; Optical beams; Particle beams; Protons; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2007. PAC. IEEE
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    978-1-4244-0916-7
  • Type

    conf

  • DOI
    10.1109/PAC.2007.4440471
  • Filename
    4440471