Title :
Overhead line equipment design and pantograph interface
Author :
Warburton, Keith
Author_Institution :
Balfour Beatty Rail, UK
Abstract :
The key function of a railway Overhead Line Equipment (OLE) is to supply power to electric traction units. This transfer takes places at the moving interface between the OLE and pantograph and it is the primary function of the designers to ensure the fundamental compatibility of these two systems, and that optimum performance is achieved over a range of weather, speed and maintenance conditions. This paper describes the fundamental technical issues affecting this interface performance.
Keywords :
pantographs; power overhead lines; railway electrification; traction; OLE; electric traction units; interface performance; maintenance conditions; optimum performance; overhead line equipment design; pantograph interface; power supply; railway overhead line equipment;
Conference_Titel :
Railway Electrification Infrastructure and Systems (REIS 2011), 5th IET Professional Development Course on
Conference_Location :
London
Electronic_ISBN :
978-1-84919-512-6
DOI :
10.1049/ic.2011.0182