DocumentCode :
2890541
Title :
Turn-Key Project During the Construction of the Telecommunication System in the Five New States of the Frg
Author :
Rath, Wolfgang
Author_Institution :
SIEMENS AG, Ã\x96N Ã\x96V VD 41, Hofmannstr. 51, D-81359 Mÿnchen
fYear :
1994
fDate :
11-15 April 1994
Firstpage :
277
Lastpage :
282
Keywords :
Cable TV; Delta modulation; Digital relays; History; Optical fiber cables; Switches; Telecommunication switching; Telecommunication traffic; Telephony; Time factors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Telecommunications Energy Special Conference, 1994. TELESCON '94. The first International
Conference_Location :
Berlin, Germany
Type :
conf
DOI :
10.1109/TELESC.1994.4794345
Filename :
4794345
Link To Document :
بازگشت