DocumentCode :
2891586
Title :
Commissioning of the J-PARC linac
Author :
Hasegawa, Kazuo
Author_Institution :
Japan Atomic Energy Agency, Tokai
fYear :
2007
fDate :
25-29 June 2007
Firstpage :
2619
Lastpage :
2623
Abstract :
The J-PARC (Japan Proton Accelerator Research Complex) is a multi purpose facility with 1 MW class proton beam power. The J-PARC comprises a linac, a 3 GeV rapid-cycling synchrotron (RCS), a 50 GeV main ring synchrotron (MR) and experimental facilities. The energy of the linac is reduced to 181 MeV for the time being, and it will be increased to 400 MeV in the near future. The 3 MeV RFQ, which is a front end of the linac, has been beam commissioned since November 2006, and we continue to work on the rest of the linac such as a 50 MeV DTL and a 181 MeV Separated-type DTL. The results and status of the J-PARC linac beam commissioning are presented.
Keywords :
linear accelerators; synchrotrons; J-PARC linac; rapid-cycling synchrotron; ring synchrotron; Acceleration; Linear particle accelerator; Mesons; Neutrino sources; Neutrons; Particle beams; Production; Proton accelerators; Structural beams; Synchrotrons;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location :
Albuquerque, NM
Print_ISBN :
978-1-4244-0916-7
Type :
conf
DOI :
10.1109/PAC.2007.4440728
Filename :
4440728
Link To Document :
بازگشت