Title :
A Detailed Analysis of Cost and Cost Evolution of Turnkey Photovoltaic Systems
Author :
Sevrin, Maurice ; Leleu, Christian
Author_Institution :
ALCATEL THOMSON FAISCEAUX HERTZIENS, 55, rue GREFFULHE, 92301 - LEVALLOIS PERRET, FRANCE
Abstract :
- This contribution is an extension of the GAS 4 economic statement on stand alone photovoltaic systems (PVS). It analyses the cost of turnkey PVS from 50 W to 2000 W for permanent DC power. - All elements, supply, packing and transportation, installation and commissioning, and finally maintenance, are examined from an economic point of view. - The reasons of the to-day choices are also approached, and the paper concludes, emphasizing, in spite of their price, the interest of PVS to power stand alone telecommunication stations.
Keywords :
Batteries; Costs; Glass; Manufacturing; Photovoltaic systems; Power generation economics; Power system economics; Protection; Solar power generation; Transportation;
Conference_Titel :
Telecommunications Energy Conference, 1986. INTELEC '86. International
Conference_Location :
Toronto, Canada
Print_ISBN :
0-9692316-1-X
DOI :
10.1109/INTLEC.1986.4794421