DocumentCode
2892140
Title
Status of J-PARC main ring synchrotron
Author
Koseki, T.
Author_Institution
KEK, Tsukuba
fYear
2007
fDate
25-29 June 2007
Firstpage
736
Lastpage
738
Abstract
Presented in this paper is a construction status of 50-GeV slow cycling main ring synchrotron (MR) of Japan Proton Accelerator Research Complex (J-PARC).
Keywords
accelerator RF systems; accelerator cavities; beam handling techniques; particle beam dynamics; proton accelerators; synchrotrons; J-PARC; Japan Proton Accelerator Research Complex; beam dynamics; electron volt energy 50 GeV; main ring synchrotron; rf cavities; Acceleration; Collimators; Linear particle accelerator; Magnets; Particle beams; Power cables; Proton accelerators; Structural beams; Synchrotrons; Wiring;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location
Albuquerque, NM
Print_ISBN
978-1-4244-0916-7
Type
conf
DOI
10.1109/PAC.2007.4440758
Filename
4440758
Link To Document