Title :
Beam operation of the saraf light ion injector
Author :
Piel, Christian ; Dunkel, Kai ; Pekeler, Michael ; Vogel, Hanspeter ; Stein, Peter Vom
Author_Institution :
ACCEL Instrum. GmbH, Bergisch Gladbach
Abstract :
In beginning of 2007 the installation of the first stage of SARAF has been finalized. The system consists out of an ECR ion source, a low energy beam transport system, a four rod RFQ, a medium energy transport system and a superconducting module housing 6 half resonators and three superconducting solenoids. This injector will be characterized with a diagnostic plate. The installation allows continuous measurement of beam charge, position and phase. The diagnostic plate in addition provides a beam halo monitor, vertical and horizontal slit and wire systems, a slow and a fast faraday cup, which can only be used in pulsed operation. The paper will describe the status of commissioning and will show first measurement results.
Keywords :
accelerator RF systems; cyclotron resonance; installation; ion sources; linear accelerators; particle beam diagnostics; particle beam injection; resonators; superconducting magnets; ECR ion source; RFQ accelerator; SARAF light ion injector; beam halo monitor; beam operation; diagnostic plate; faraday cup; horizontal slit; linac; low energy beam transport system; medium energy transport system; resonators; superconducting module; superconducting solenoids; vertical slit; Current measurement; Instruments; Ion accelerators; Ion beams; Ion sources; Particle beams; Proton accelerators; Solenoids; Superconducting filaments and wires; Superconducting magnets;
Conference_Titel :
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location :
Albuquerque, NM
Print_ISBN :
978-1-4244-0916-7
DOI :
10.1109/PAC.2007.4440772