Author :
Milardi, C. ; Alesini, D. ; Bettoni, S. ; Biagini, M.E. ; Biscari, C. ; Boni, R. ; Boscolo, M. ; Buonomo, B. ; Clozza, A. ; Monache, G. Delle ; Demma, T. ; Di Pasquale, E. ; di Pirro, G. ; Drago, A. ; Gallo, A. ; Ghigo, A. ; Guiducci, S. ; Iorio, P. ; Lig
Abstract :
Beam operations at DAΦPNE restarted in October 2006 after a four months shut-down to remove the KLOE experimental detector and to install the FINUDA one. This period has been also used for maintenance and implementation of several upgrades. Already in the first two months of operation the peak and integrated luminosity exceeded the values obtained during the first FINUDA run by 20%, and have been steadily improving toward the end of the operation. By June 2007 ˜ 1 fb-1 integrated luminosity has been logged by the experiment. The collider performances during the run are presented together with the improvements obtained in terms of beam dynamics and beam-beam behaviour coming from several collider modifications.
Keywords :
electron ring accelerators; particle beam diagnostics; particle beam dynamics; position sensitive particle detectors; wigglers; DAΦNE electron ring; FINUDA detectors; KLOE experimental detector; beam dynamics; beam position monitors; beam-beam interaction; collider luminosity; wiggler field setup; Control systems; Detectors; Electromagnetic coupling; Ice; Linear particle accelerator; Optical beams; Particle beams; Position measurement; Testing; Undulators;