DocumentCode :
2893728
Title :
Status report on the ral front end test stand
Author :
Letchford, Alan ; Faircloth, Dan ; Daly, Adeline ; Clarke-Gayther, Michael A. ; Plostinar, Ciprian ; Gabor, Christoph ; Cheng, Yi Aaron ; Jolly, Simon ; Kurup, Ajit ; Savage, Peter ; Pozimski, Jürgen Klaus ; Back, John ; Bermejo, Javier ; Lucas, Julio ; A
Author_Institution :
CCLRC/RAL/ISIS, Didcot
fYear :
2007
fDate :
25-29 June 2007
Firstpage :
1634
Lastpage :
1636
Abstract :
High power proton accelerators (HPPAs) with beam powers in the several megawatt range have many applications including drivers for spallation neutron sources [1],neutrino factories [2], waste transmuters and tritium production facilities. The UK´s commitment to the development of the next generation of HPPAs is demonstrated by a test stand being constructed in collaboration between RAL,Imperial College London, the University of Warwick and the Universidad del Pais Vasco. The aim of the RAL Front End Test Stand is to demonstrate that chopped low energy beams of high quality can be produced and is intended to allow generic experiments exploring a variety of operational conditions. This paper describes the status of the RAL Front End Test Stand.
Keywords :
beam choppers; beam handling techniques; klystrons; linear accelerators; proton accelerators; HPPA; High power proton accelerators; RAL Front End Test Stand; RFQ accelerator; beam chopper; klystron; Educational institutions; FETs; Linear particle accelerator; Neutrino sources; Particle beams; Production facilities; Proton accelerators; Radio frequency; Structural beams; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location :
Albuquerque, NM
Print_ISBN :
978-1-4244-0916-7
Type :
conf
DOI :
10.1109/PAC.2007.4440847
Filename :
4440847
Link To Document :
بازگشت