• DocumentCode
    2894984
  • Title

    DC Power System Failure; A Case Study and Implications for the Maintenance

  • Author

    Björk, Dag

  • Author_Institution
    Ericsson Power Systems, RIFA AB, S-163 81 Stockholm, SWEDEN
  • fYear
    1987
  • fDate
    14-17 June 1987
  • Firstpage
    367
  • Lastpage
    369
  • Abstract
    The reliability requirements for the power supply equipment in a telephone exchange must of necessity be high, since no telephone traffic is possible if there is a break in the power supply. Most power supply equipments are known for high reliability, but this does not mean that they do not need supervision and maintenance. This paper emphasizes the importance of preventive maintenance and gives examples of the possible consequences of omissions in this respect. It also describes how the maintenance can be organized, as well as required knowledge and routines.
  • Keywords
    Batteries; Electric breakdown; Power generation; Power supplies; Power system reliability; Power systems; Preventive maintenance; Rectifiers; Telephony; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Telecommunications Energy Conference, 1987. INTELEC '87. The Ninth International
  • Conference_Location
    Stockholm, Sweden
  • Print_ISBN
    91-7810-916-7
  • Type

    conf

  • DOI
    10.1109/INTLEC.1987.4794583
  • Filename
    4794583