• DocumentCode
    289501
  • Title

    Renewal of the Central Line

  • Author

    Doherty, A.M.

  • fYear
    1994
  • fDate
    34640
  • Firstpage
    42461
  • Lastpage
    42466
  • Abstract
    Describes how a systems engineering approach has been developed into the scope of the Central Line Project over the last six years and how a systems approach has been achieved in practice. The Paper also describes how its use has enabled the achievement of the Project´s aims and targets
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Systems Engineering on a Large Capital Railway Project, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    383658