• DocumentCode
    2895491
  • Title

    Capacity planning in wood products industry using simulation

  • Author

    Gupta, Tarun ; Arasakesari, Subramaniam

  • Author_Institution
    Western Michigan Univ., Kalamazoo, MI, USA
  • fYear
    1991
  • fDate
    8-11 Dec 1991
  • Firstpage
    435
  • Lastpage
    440
  • Abstract
    The authors present an analysis of an office furniture manufacturing facility for its capacity and in-process storage-related problems. SLAM II simulation language is used in this study. Several scenarios were also developed to determine alternative solutions to the stated problems. Simulation results are also discussed for each of these scenarios. Seven simulation experiments were conducted to determine possible outcomes of specific options. Once the simulation model with base case was developed, further enhancement to evaluate performance with defined modified condition was quick. The model was used at each stage of analysis for the stated capacity and in-process storage problems
  • Keywords
    furniture; management science; wood processing; SLAM II simulation language; capacity planning; in-process storage-related problems; office furniture manufacturing facility; simulation experiments; simulation model; wood products industry; Analytical models; Capacity planning; Industrial engineering; Lamination; Manufacturing; Power system modeling; Predictive models; Production; Simultaneous localization and mapping; Wood industry;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 1991. Proceedings., Winter
  • Conference_Location
    Phoenix, AZ
  • Print_ISBN
    0-7803-0181-1
  • Type

    conf

  • DOI
    10.1109/WSC.1991.185644
  • Filename
    185644