DocumentCode
2896065
Title
PF-ring and PF-AR operational status
Author
Kobayashi, Y. ; Asaoka, S. ; Cheng, W.X. ; Haga, K. ; Harada, K. ; Honda, T. ; Izawa, M. ; Kasuga, T. ; Maezawa, H. ; Mishina, A. ; Mitsuhashi, T. ; Miyajima, T. ; Miyauchi, H. ; Nagahashi, S. ; Nogami, T. ; Obina, T. ; Pak, C.O. ; Sakanaka, S. ; Sasaki,
Author_Institution
KEK, Tsukuba
fYear
2007
fDate
25-29 June 2007
Firstpage
1019
Lastpage
1021
Abstract
The present operational status of the Photon Factory storage ring (PF-ring) and the Photon Factory advanced ring (PF-AR) in KEK is reported. The scheduled user times of them were more than 4000 hours in FY2006. In the last summer shutdown, new undulators were installed in both of the rings and have been stably operated. A top-up operation in a single-bunch mode was demonstrated for six days in February 2007 druring the shutdown of KEKB at the PF-ring.
Keywords
electron accelerators; particle beam bunching; particle beam injection; storage rings; wigglers; KEK; PF-AR; PF-ring; Photon Factory advanced ring; Photon Factory storage ring; beam injections; single-bunch mode; undulators; Production facilities; Storage rings; Undulators;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location
Albuquerque, NM
Print_ISBN
978-1-4244-0916-7
Type
conf
DOI
10.1109/PAC.2007.4440968
Filename
4440968
Link To Document