DocumentCode :
2896222
Title :
Completion of the Australian synchrotron storage ring RF system commissioning
Author :
Takama, S. ; Hirata, Yasuhisa ; Kamikubo, H. ; Nobusada, Y. ; Suzuki, Hajime
Author_Institution :
Toshiba, Yokohama
fYear :
2007
fDate :
25-29 June 2007
Firstpage :
1040
Lastpage :
1042
Abstract :
The installation and commissioning of the Australian Synchrotron Storage Ring RF System (SR RF System) was completed. SR RF System consists of four sets of 500 MHz 150 kW-CW klystron and 750 kV normal conducting cavity. After the cavity aging, the RF System achieved 48 hours continuous operation in November 2006. The paper will present the design and commissioning results.
Keywords :
accelerator RF systems; accelerator cavities; commissioning; installation; klystrons; storage rings; synchrotrons; Australian Synchrotron Storage Ring RF System commissioning; SR RF System; conducting cavity; frequency 500 MHz; installation; klystron; voltage 750 kV; Australia; Circuits; Control systems; Heating; Klystrons; Radio frequency; Storage rings; Strontium; Synchrotrons; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location :
Albuquerque, NM
Print_ISBN :
978-1-4244-0916-7
Type :
conf
DOI :
10.1109/PAC.2007.4440975
Filename :
4440975
Link To Document :
بازگشت