• DocumentCode
    2896622
  • Title

    The commissioning of the diamond storage ring

  • Author

    Bartolini, R.

  • Author_Institution
    Diamond Light Source, Didcot
  • fYear
    2007
  • fDate
    25-29 June 2007
  • Firstpage
    1109
  • Lastpage
    1111
  • Abstract
    The Diamond storage ring has opened for user operation at the end January 2007. The storage ring has been successfully commissioned at 3 GeV in three months by December 2006. An intensive accelerator physics program has allowed the design emittance at 2.7 nm to be reached and the commissioning of the first eight insertion devices. We describe here the results of the measurements performed to characterize accelerator optics, to bring the insertion device in operation and a first analysis of orbit stability and collective instabilities, as well as plans for top-up operation.
  • Keywords
    particle beam injection; particle beam stability; particle optics; storage rings; accelerator optics; accelerator physics program; beam injection; beamline optics; collective instabilities; diamond storage ring; orbit stability; Extraterrestrial measurements; Lattices; Matrix decomposition; Nonlinear optics; Notice of Violation; Optical feedback; Performance evaluation; Stability analysis; Storage rings; Vibration measurement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2007. PAC. IEEE
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    978-1-4244-0916-7
  • Type

    conf

  • DOI
    10.1109/PAC.2007.4440998
  • Filename
    4440998