DocumentCode
2896622
Title
The commissioning of the diamond storage ring
Author
Bartolini, R.
Author_Institution
Diamond Light Source, Didcot
fYear
2007
fDate
25-29 June 2007
Firstpage
1109
Lastpage
1111
Abstract
The Diamond storage ring has opened for user operation at the end January 2007. The storage ring has been successfully commissioned at 3 GeV in three months by December 2006. An intensive accelerator physics program has allowed the design emittance at 2.7 nm to be reached and the commissioning of the first eight insertion devices. We describe here the results of the measurements performed to characterize accelerator optics, to bring the insertion device in operation and a first analysis of orbit stability and collective instabilities, as well as plans for top-up operation.
Keywords
particle beam injection; particle beam stability; particle optics; storage rings; accelerator optics; accelerator physics program; beam injection; beamline optics; collective instabilities; diamond storage ring; orbit stability; Extraterrestrial measurements; Lattices; Matrix decomposition; Nonlinear optics; Notice of Violation; Optical feedback; Performance evaluation; Stability analysis; Storage rings; Vibration measurement;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location
Albuquerque, NM
Print_ISBN
978-1-4244-0916-7
Type
conf
DOI
10.1109/PAC.2007.4440998
Filename
4440998
Link To Document