DocumentCode :
2896622
Title :
The commissioning of the diamond storage ring
Author :
Bartolini, R.
Author_Institution :
Diamond Light Source, Didcot
fYear :
2007
fDate :
25-29 June 2007
Firstpage :
1109
Lastpage :
1111
Abstract :
The Diamond storage ring has opened for user operation at the end January 2007. The storage ring has been successfully commissioned at 3 GeV in three months by December 2006. An intensive accelerator physics program has allowed the design emittance at 2.7 nm to be reached and the commissioning of the first eight insertion devices. We describe here the results of the measurements performed to characterize accelerator optics, to bring the insertion device in operation and a first analysis of orbit stability and collective instabilities, as well as plans for top-up operation.
Keywords :
particle beam injection; particle beam stability; particle optics; storage rings; accelerator optics; accelerator physics program; beam injection; beamline optics; collective instabilities; diamond storage ring; orbit stability; Extraterrestrial measurements; Lattices; Matrix decomposition; Nonlinear optics; Notice of Violation; Optical feedback; Performance evaluation; Stability analysis; Storage rings; Vibration measurement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location :
Albuquerque, NM
Print_ISBN :
978-1-4244-0916-7
Type :
conf
DOI :
10.1109/PAC.2007.4440998
Filename :
4440998
Link To Document :
بازگشت