DocumentCode
2897734
Title
Initial commissioning experience with the LCLS injector
Author
Akre, R. ; Castro, Jose ; Ding, Yi ; Dowell, D. ; Emma, Philip ; Frisch, Jerome ; Gilevich, S. ; Hays, G. ; Hering, Z. ; Huang, R.I. ; Krejcik, P. ; Limborg-Deprey, C. ; Loos, H. ; Miahnahri, A. ; Rivetta, C. ; Saleski, M. ; Schmerge, J. ; Schultz, D. ; T
Author_Institution
SLAC, Stanford
fYear
2007
fDate
25-29 June 2007
Firstpage
1302
Lastpage
1304
Abstract
The linac coherent light source (LCLS) is a SASE X- ray free-electron laser (FEL) project presently under construction at SLAC [1]. The injector section, from drive-laser and RF photocathode gun through first bunch compressor chicane, was installed in fall 2006. Initial system commissioning with an electron beam is taking place during the spring and summer of 2007. The second phase of construction, including second bunch compressor and full linac, will begin later, in the fall of 2007. We report here on experience gained during the first phase of machine commissioning, including RF photocathode gun, linac booster section, S-band and X-band RF systems, first bunch compressor, and the various beam diagnostics.
Keywords
X-ray lasers; free electron lasers; linear accelerators; particle beam bunching; particle beam diagnostics; particle beam injection; photocathodes; LCLS injector; RF photocathode gun; S-band RF system; SASE X-ray free-electron laser; X-band RF system; beam diagnostics; bunch compressor chicane; linac booster section; linac coherent light source; Cathodes; Copper; Electron beams; Laser mode locking; Linear particle accelerator; Optical amplifiers; Pulse amplifiers; Quantum cascade lasers; Radio frequency; Structural beams;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location
Albuquerque, NM
Print_ISBN
978-1-4244-0916-7
Type
conf
DOI
10.1109/PAC.2007.4441063
Filename
4441063
Link To Document