Abstract :
The first outcome from a newly operational RJ beam facility called the RIKEN RIB Factory was obtained in the first test experiment conducted in the last week of May 2007. A new very neutron-rich isotope, Pd-125 was discovered in the in-flight fission of U-238 isotopes accelerated up to 345 MeV/nucleon. Since 1997, RIKEN has been constructing this facility, where three new ring cyclotrons with K-values of 570 MeV, 980 MeV and 2600 MeV, respectively, boost energies of the output beams from the existing K540-MeV ring cyclotron up to 440 MeV/nucleon for light ions and 350 MeV/nucleon for very heavy ions. The K2600-MeV ring cyclotron is the world´s first ring cyclotron with superconducting sector magnets. These energetic heavy-ion beams are converted into intense RI beams via projectile fragmentation of stable isotopes or in-flight fission of uranium isotopes by a superconducting fragment separator.
Keywords :
accelerator magnets; cyclotrons; radioactive ion beams; superconducting magnets; 125Pd neutron-rich isotope; RIKEN RIB Factory; cyclotrons; electron volt energy 2600 MeV; electron volt energy 540 MeV; electron volt energy 980 MeV; in-flight 238U fission; projectile fragmentation; radioactive ion beam facility; superconducting fragment separator; superconducting sector magnets; Acceleration; Cyclotrons; Isotopes; Linear particle accelerator; Particle beams; Particle separators; Production facilities; Projectiles; Superconducting magnets; Testing;