DocumentCode
289928
Title
Safeguard and renovation of air conditioning installations for communication centers
Author
Sourdoire, H.
Author_Institution
CAPII, Argenteuil, France
Volume
1
fYear
1993
fDate
27-30 Sep 1993
Firstpage
229
Abstract
The rooms in which communication centers are set up must be kept in clean air, temperature and hygrometry conditions compatible with building recommendations. Here, the author discusses the following requirements for communication center air conditioning installations: nonstop working of the machines; a temporary solution in case of a failure or renovation works; two backup products, heavy and light; restraint for the building; electric power and air ducts setting; area access; hot air extraction; operation; and maintenance
Keywords
air conditioning; cooling; maintenance engineering; telecommunication equipment; air conditioning; air ducts; communication centers; hot air extraction; maintenance; operation; renovation; Air conditioning;
fLanguage
English
Publisher
ieee
Conference_Titel
Telecommunications Energy Conference, INTELEC '93. 15th International
Conference_Location
Paris
Print_ISBN
0-7803-1842-0
Type
conf
DOI
10.1109/INTLEC.1993.388438
Filename
388438
Link To Document