DocumentCode :
289928
Title :
Safeguard and renovation of air conditioning installations for communication centers
Author :
Sourdoire, H.
Author_Institution :
CAPII, Argenteuil, France
Volume :
1
fYear :
1993
fDate :
27-30 Sep 1993
Firstpage :
229
Abstract :
The rooms in which communication centers are set up must be kept in clean air, temperature and hygrometry conditions compatible with building recommendations. Here, the author discusses the following requirements for communication center air conditioning installations: nonstop working of the machines; a temporary solution in case of a failure or renovation works; two backup products, heavy and light; restraint for the building; electric power and air ducts setting; area access; hot air extraction; operation; and maintenance
Keywords :
air conditioning; cooling; maintenance engineering; telecommunication equipment; air conditioning; air ducts; communication centers; hot air extraction; maintenance; operation; renovation; Air conditioning;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Telecommunications Energy Conference, INTELEC '93. 15th International
Conference_Location :
Paris
Print_ISBN :
0-7803-1842-0
Type :
conf
DOI :
10.1109/INTLEC.1993.388438
Filename :
388438
Link To Document :
بازگشت