Title :
Development of 10 MW L-Band Multi-Beam Klystron (MBK) for european X-FEL project
Author :
Chin, Y.H. ; Miyake, S. ; Yano, A. ; Hayashi, K.
Author_Institution :
KEK, Tsukuba
Abstract :
A 10 MW L-band multi-beam klystron (MBK) has been developed and tested by Toshiba, Japan for the European XFEL and a future linear collider projects. The Toshiba MBK has six low-perveance beams operated at low voltage of 115 kV (for 10 MW) and six ring-shaped cavities to enable a higher efficiency than a single-beam klystron for a similar power. After the successful acceptance testing at the Toshiba Nasu factory in March 2006, attended by DESY staff, the final acceptance test was done at DESY laboratory in June 2006. In these tests, the output power of 10.2 MW, more than the design goal (10 MW), has been demonstrated at the standard beam voltage of 115 kV at the RF pulse length of 1.5 ms and the beam pulse of 1.7 ms at 10 Hz. The efficiency was 66%. The robustness of the tube was also demonstrated by being operated continuously more than 24 hours above 10 MW. Total time of operation on the test stand at DESY already exceeds 750 hours (up to date February 4, 2007). A horizontal version of the Toshiba MBK is now under construction.
Keywords :
accelerator RF systems; accelerator cavities; electron accelerators; electron beams; free electron lasers; klystrons; particle beam focusing; DESY; European XFEL; L-band multibeam klystron; RF pulse length; Toshiba MBK; electron beam focusing; linear collider projects; power 10 MW; ring-shaped cavities; simulation model; single-beam klystron; Klystrons; L-band; Laboratories; Low voltage; Power generation; Production facilities; Radio frequency; Robustness; Structural beams; Testing;
Conference_Titel :
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location :
Albuquerque, NM
Print_ISBN :
978-1-4244-0916-7
DOI :
10.1109/PAC.2007.4441162