DocumentCode :
2899515
Title :
Construction of the baseline SC cavity system for STF at KEK
Author :
Kako, E. ; Hayano, H. ; Noguchi, S. ; Shishido, T. ; Watanabe, K. ; Yamamoto, Y.
Author_Institution :
KEK, Tsukuba
fYear :
2007
fDate :
25-29 June 2007
Firstpage :
2107
Lastpage :
2109
Abstract :
The STF-Baseline superconducting cavity system, which includes four TESLA-type 9-cell cavities, input couplers and frequency tuners, has been developed for the future ILC project. A main improvement in the cavity system is a very stiff design in a He vessel and a cavity tuning system, which can relax a cavity deformation due to Lorentz force. Vertical tests of four 9-cell cavities have been carried out repeatedly, and the attained accelerating gradients have reached to 20 ~ 29 MV/m with Qo values higher than 1times1010. Peculiar phenomena, like increasing of Qo values with higher Eacc or very slow degradation of Qo values, were observed in the vertical tests. RF processing of input couplers was successfully carried out up to 1.0 MW with a 1.5 msec and 5 Hz operation .
Keywords :
accelerator cavities; beam handling techniques; cyclotrons; electron accelerators; ion accelerators; linear colliders; proton accelerators; storage rings; International Linear Collider project; Lorentz force; STF-baseline superconducting cavity system; TESLA-type 9-cell cavities; accelerating gradients; cavity deformation; cavity tuning system; frequency tuners; input couplers; Couplers; Helium; Lorentz covariance; Optical coupling; Radio frequency; Structural beams; Testing; Titanium; Tuners; Tuning;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location :
Albuquerque, NM
Print_ISBN :
978-1-4244-0916-7
Type :
conf
DOI :
10.1109/PAC.2007.4441165
Filename :
4441165
Link To Document :
بازگشت