DocumentCode :
289956
Title :
Power supply for the future Lebanese telecommunication network
Author :
Harb, Simon
Author_Institution :
Setelcom, Jounieh, Lebanon
Volume :
1
fYear :
1993
fDate :
27-30 Sep 1993
Firstpage :
21
Abstract :
After 16 years of war, the Lebanese telecommunication network is badly destroyed. The rehabilitation/extension of this network is starting. The rehabilitation of around 100 power supply plants and the implementation of around 160 new power supply plants is planned. After a quick presentation of the actual and future Lebanese network, the authors describe the main constraints in the field of energy for the telecommunication. Afterwards some orientations for the future implementation of new power supply plants are proposed. The study of the Lebanese case can be extended to several countries in the world were similar constraints can be found
Keywords :
diesel-electric generators; diesel-electric power stations; telecommunication networks; telecommunication power supplies; Lebanese telecommunication network; diesel engine generators; power supply plants; Cables; Circuits; Content addressable storage; Context-aware services; Gold; Milling machines; Out of order; Power supplies; Telephony;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Telecommunications Energy Conference, INTELEC '93. 15th International
Conference_Location :
Paris
Print_ISBN :
0-7803-1842-0
Type :
conf
DOI :
10.1109/INTLEC.1993.388474
Filename :
388474
Link To Document :
بازگشت