DocumentCode :
2902512
Title :
Results on CLIC proof of principle from CTF3
Author :
Corsini, R.
Author_Institution :
CERN, Geneva
fYear :
2007
fDate :
25-29 June 2007
Firstpage :
1979
Lastpage :
1983
Abstract :
The CLIC Test Facility CTF3, built at CERN by an international collaboration, aims at demonstrating the feasibility of the CLIC scheme of multi-TeV electron- positron collider by 2010. CTF3 consists of a 150 MeV drive beam linac followed by a 42 m long delay loop and an 84 m combiner ring. The installation will include in its final configuration a two-beam test stand and a test decelerator. The linac and delay loop have been already commissioned, while the combiner ring has been completed by the first half of 2007. High gradient testing of accelerating structures is also under way. The status of the facility, the experimental results obtained and the future plans will be presented.
Keywords :
beam handling techniques; electron accelerators; linear colliders; particle beam bunching; CERN; CLIC test facility CTF3; bunched beam; electron-positron collider; linac; test decelerator; two-beam test stand; Acceleration; Colliding beam devices; Delay; Electron beams; Life estimation; Linear particle accelerator; Particle beams; Radio frequency; Test facilities; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location :
Albuquerque, NM
Print_ISBN :
978-1-4244-0916-7
Type :
conf
DOI :
10.1109/PAC.2007.4441331
Filename :
4441331
Link To Document :
بازگشت