• DocumentCode
    2906814
  • Title

    Project summary of Three Gorges´ 840MVA Hydro-generator with Close-Loop-Self-Circulating Evaporative Cooling System

  • Author

    Jiayi Yuan ; Dawei Meng ; Guobiao Gu ; Fuchuan Song ; Tianpeng Zhang

  • Author_Institution
    Harbin Univ. of Sci. & Technol., Harbin, China
  • fYear
    2013
  • fDate
    26-29 Oct. 2013
  • Firstpage
    511
  • Lastpage
    514
  • Abstract
    In December 2011 and July 2012, two sets of 840MVA Hydro-generator of Three Gorges on Yangtze River with Close-Loop-Self-Circulating Evaporative Cooling (CLSCEC) System were put into commercial operation. In this paper, we make engineering summary of these two generators with CLSCEC System. We also make a comparison between the internal water cooling (IWC) hydro-generator used in Three Gorges power plant and the CLSCEC hydro-generator in fields of their operating characteristics, working performances, technical features, working safety and reliability. In addition, engineering structures, type test results and systematic emulating calculation of CLSCEC schemes are analyzed.
  • Keywords
    cooling; hydroelectric generators; power generation reliability; CLSCEC system; IWC; Three Gorges hydrogenerator; Yangtze River; apparent power 840 MVA; close-loop-self-circulating evaporative cooling system; engineering structures; internal water cooling; operating characteristics; reliability; systematic emulating calculation; technical features; type test results; working performances; working safety; Bars; Cooling; Generators; Heat engines; Liquids; Stator cores;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical Machines and Systems (ICEMS), 2013 International Conference on
  • Conference_Location
    Busan
  • Print_ISBN
    978-1-4799-1446-3
  • Type

    conf

  • DOI
    10.1109/ICEMS.2013.6713114
  • Filename
    6713114