DocumentCode
2910872
Title
The improved algorithm of project cycle’s GERT model based on Standard Interval Grey Numbers
Author
Yun-long, Zhao ; Zhi-Geng, Fang
Author_Institution
Nanjing Univ. of Aeronaut. & Astronaut., Nanjing
fYear
2007
fDate
18-20 Nov. 2007
Firstpage
48
Lastpage
51
Abstract
In order to estimate and control the project cycle of the new product research, the author introduces the interval grey numbers in grey system to the solution of the GERT network. Use the interval grey numbers to improve the network parameter flow, thus get the improved computation of the project cycle. Take overall design process of plane for example to carry on the research on the successful probability and deadline problem of the project, the result has shown its practicability and applicability in real project management.
Keywords
grey systems; product development; project management; GERT model; new product research; project management; standard interval grey numbers; Aircraft; Cities and towns; Computer networks; Intelligent networks; Intelligent systems; Process design; Project management; Random variables; Research and development; Uncertainty; GERT model; Project Cycle Control; Standard Interval Grey Numbers;
fLanguage
English
Publisher
ieee
Conference_Titel
Grey Systems and Intelligent Services, 2007. GSIS 2007. IEEE International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4244-1294-5
Electronic_ISBN
978-1-4244-1294-5
Type
conf
DOI
10.1109/GSIS.2007.4443235
Filename
4443235
Link To Document