• DocumentCode
    2913499
  • Title

    Production scheduling based on Tabu and Scatter Search techniques with an heuristic approach

  • Author

    Savino, Matteo Mario

  • Author_Institution
    Dept. of Eng., Univ. of Sannio, Benevento
  • fYear
    2008
  • fDate
    17-20 Dec. 2008
  • Firstpage
    934
  • Lastpage
    938
  • Abstract
    In this paper a two-stage decisions approach is proposed. In the first stage the production cycle is analysed in order to model it and to identify its constraints, while in the second one a feasible set of scenarios is generated. The core procedure is based on Tabu Search and Scatter Search methodologies, with which a population of paths evolves until a criteria is satisfied, yielding the best path. Using the first one the production cycle is analysed in order to model it and to identify its constraints while, using the second one a feasible set of scenarios is generated to introduce the dependencies between activities.
  • Keywords
    production control; scheduling; search problems; heuristic approach; production cycle; production scheduling; scatter search techniques; tabu search; two-stage decisions approach; Automatic control; Costs; Design optimization; Genetic algorithms; Job shop scheduling; Production; Robot control; Robot vision systems; Robotics and automation; Scattering; Heuristics; Scheduling; Tabu Search; Work in Process;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control, Automation, Robotics and Vision, 2008. ICARCV 2008. 10th International Conference on
  • Conference_Location
    Hanoi
  • Print_ISBN
    978-1-4244-2286-9
  • Electronic_ISBN
    978-1-4244-2287-6
  • Type

    conf

  • DOI
    10.1109/ICARCV.2008.4795643
  • Filename
    4795643