    A sequantial distributed approach for the joint scheduling of jobs and maintenance operations in the flowshop sequencing problem

  • Author

    Khelifati, Si Larabi ; Benbouzid-sitayeb, Fatima

  • Author_Institution
    Lab. des Methodes de Conception de Syst. (LMCS), Ecole Nat. Super. d´´Inf. of Algiers (ESI ex INI), Algiers, Algeria
  • fYear
    2011
  • fDate
    22-24 Nov. 2011
  • Firstpage
    420
  • Lastpage
    425
  • Abstract
    Many works refer to the scheduling problem of both preventive maintenance and production activities. Few works concern the dynamic scheduling problem of these two activities. This aspect is mainly concerned by corrective maintenance activities (equipment failure). In this regard, we propose a distributed approach using multi-agent paradigm for scheduling independent jobs and maintenance operations in the flowshop sequencing problem. The proposed multi-agent system introduces a dialogue between two communities of agents (production and maintenance) based on a two-step sequential strategy: first scheduling the production jobs then inserting the preventive maintenance operations, taking the production schedule as a mandatory constraint, to generate a joint production and maintenance schedule. The objective is then to optimize a bi-objective function which takes into account both maintenance and production criterion. It also provides a framework in order to react to the disturbances occurring in the workshop. The main point is to show how the proposed multi-agent system provides a better compromise between the satisfactions of respective objectives of the two functions.
  • Keywords
    flow production systems; flow shop scheduling; job shop scheduling; multi-agent systems; optimisation; preventive maintenance; biobjective function; dynamic scheduling problem; flowshop sequencing problem; job joint scheduling; multiagent system; preventive maintenance operations; production activities; production scheduling; sequential distributed approach; two-step sequential strategy; Delay; Electric breakdown; Job shop scheduling; Joints; Maintenance engineering; Schedules; Corrective maintenance; Flowshop; Joint scheduling; Multi-agent systems; Preventive maintenance; Production;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Systems Design and Applications (ISDA), 2011 11th International Conference on
  • Conference_Location
    Cordoba
  • ISSN
    2164-7143
  • Print_ISBN
    978-1-4577-1676-8
  • Type

    conf

  • DOI
    10.1109/ISDA.2011.6121692
  • Filename
    6121692