DocumentCode
291986
Title
Consistency of decisions in multi-level production planning: analysis and implementation
Author
Fontan, G. ; Hetreux, G. ; Merce, C.
Author_Institution
Lab. d´´Anal. et d´´Archit. des Syst., CNRS, Toulouse, France
Volume
2
fYear
1994
fDate
2-5 Oct 1994
Firstpage
1183
Abstract
This study deals with the aggregation of time in the case of a multiproduct, multistage planning problem. The paper presents the planning problem considered, the two-level decisional structure, and the models associated with each one of these levels. The concept of consistency within the framework of this problem is structured. Sufficient conditions of aggregate consistency are established and the complexity brought in by these additional constraints is assessed. An implementation of the sufficient consistency conditions so as to limit the effects of the complexity induced by the constraints is proposed
Keywords
decision theory; optimisation; planning; production control; consistency concept; consistent aggregate plan; constraints; heuristics; multi-level production planning; multistage planning; sufficient conditions; two-level decisional structure; Aggregates; Availability; Capacity planning; Manufacturing; Meeting planning; Process planning; Production planning; Sufficient conditions; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man, and Cybernetics, 1994. Humans, Information and Technology., 1994 IEEE International Conference on
Conference_Location
San Antonio, TX
Print_ISBN
0-7803-2129-4
Type
conf
DOI
10.1109/ICSMC.1994.400005
Filename
400005
Link To Document