• DocumentCode
    2920344
  • Title

    An adaptive intelligent method for manufacturing process optimization in steelworks

  • Author

    Xia Zhu ; Xiaoping Li ; Qian Wang

  • Author_Institution
    Key Lab. of Comput. Network & Inf. Integration Minist. of Educ., Southeast Univ., Nanjing, China
  • fYear
    2013
  • fDate
    27-29 June 2013
  • Firstpage
    363
  • Lastpage
    368
  • Abstract
    In this paper, the manufacturing process in iron and steel manufacturing systems is modeled as the m-machine no-wait flowshop scheduling problem with sequence-dependent setup times. To avoid extreme uneven utilization of machine capacity, makespan is considered as the minimization criterion. An adaptive intelligent method named GEIM is proposed, which is a new meta-heuristic on the basis of greedy randomized adaptive search procedure and evolutionary local search, for the considered problem. Path-relinking strategy is adopted to bridge the local optimum and elite solutions for exploring the solution spaces. Attributes of elite solutions are extracted to guide the local search process and an adaptive control mechanism is provided for the diversification of elite set at the end phase of the searching process. The proposed algorithm is compared with some existing approaches from the literature on classical benchmark instances. Computational results show that the proposed algorithm outperforms the existing ones and is suitable for optimizing the manufacturing process in steelworks.
  • Keywords
    evolutionary computation; flow shop scheduling; iron; manufacturing processes; optimisation; search problems; steel industry; adaptive control mechanism; adaptive intelligent method; adaptive search procedure; evolutionary local search; flowshop scheduling problem; iron manufacturing systems; local search process; machine capacity; manufacturing process optimization; path relinking strategy; steel manufacturing systems; steelworks; Algorithm design and analysis; Coatings; Frequency modulation; Job shop scheduling; Manufacturing processes; Optimization; Steel; GRASP; makespan; manufacturing process; no-wait flowshops; sequence-dependent setup times;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Supported Cooperative Work in Design (CSCWD), 2013 IEEE 17th International Conference on
  • Conference_Location
    Whistler, BC
  • Print_ISBN
    978-1-4673-6084-5
  • Type

    conf

  • DOI
    10.1109/CSCWD.2013.6580989
  • Filename
    6580989